I've have a Schedule Plus customer who runs a retirement home. There are 2 networks, a PACA, Bridge, CNI, Relay & Dimmer modules and a few switches. Most activity on the networks is taken up monitoring aircon, cold rooms, laundries, etc. The lighting is mainly controlled by schedules on the PACA with DLT switches overriding these. The two networks have a common lighting app (#56) and common lighting groups (I have validated that the groups in both networks correspond). I have recently discovered that scenes trigggered on the PACA only turn on lighting groups on network 1 and none on network 2. This is evident in the app logs for networks 1 & 2. However if I go to the Toolkit lighting app in network 1 and turn on say group 10 then this same group is turned on in network 2. Switches in network 1 that trigger scenes in network 2 work OK aswell. It's only when a schedule calls a scene on the PACA that network 1 only groups get activated. I have tried various combinations of triggers and groups and reset the bridge but to no avail. Any ideas?