Control Scene on C-Touch A, From C-Touch B?

Discussion in 'C-Touch/HomeGate/SchedulePlus/PICED Software' started by tunkselectrical_ryan, Dec 3, 2008.

  1. tunkselectrical_ryan

    tunkselectrical_ryan

    Joined:
    Sep 23, 2008
    Messages:
    6
    Likes Received:
    0
    Location:
    Dromana
    Overview:
    I have a number of touch screens in a residence that i am configuring. I have a "Master" C-touch which is storing scenes that are triggered from reflection switches. I wish to access some of these scenes from another C-Touch ( in the form of a slider).

    Problem:
    When assigning a scene to a slider, when i select "scene groups" there are no scenes in the list as they are not stored on that particular C-Touch.

    Question:
    How do i assign the scene to the slider?
     
    tunkselectrical_ryan, Dec 3, 2008
    #1
  2. tunkselectrical_ryan

    Darren Senior Member

    Joined:
    Jul 29, 2004
    Messages:
    2,361
    Likes Received:
    0
    Location:
    Adelaide, South Australia
    The only way you can control the scenes in another unit is by triggering them. You will not be able to use a slider to control the scene unless you implement some logic code.
     
    Darren, Dec 3, 2008
    #2
  3. tunkselectrical_ryan

    tunkselectrical_ryan

    Joined:
    Sep 23, 2008
    Messages:
    6
    Likes Received:
    0
    Location:
    Dromana
    Thanks for that Darren.
     
    tunkselectrical_ryan, Dec 8, 2008
    #3
Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments (here). After that, you can post your question and our members will help you out.