Hi alepore Perhaps you could attach a momentary contact or whatever method you can come up at the RELVP wiring to rule out the CBus relay. edit Or even better at the Daikin add in board to rule out the wiring. There is a minimum time spec for the momentary input on the add in board but I'm sure you read that. The CBus low voltage relay has some switching time constraints. It's in the instructions if you want to read about it. Daikin tech support should be best able to get you sorted. Then you can have another look at the CBus relay side of things when you know the interface is working. It would be good to check the service indicator LED's on the interface before you call them.