Schedule plus keeps re-syncronising

Discussion in 'General Discussion' started by dragshot, Jul 7, 2009.

  1. dragshot

    dragshot

    Joined:
    Oct 30, 2008
    Messages:
    24
    Likes Received:
    0
    I have schedule plus software running to schedule the time at which the lights come on & off everyday.

    There are six networks of which one network keeps resynchronising all over after getting an error status during sychronisation.

    There are 79 units in this network the error status is always shown after the 59th unit is synchronised and the 60th unit is being synchronised.

    Hence schedule plus cannot communicate with the units on this network.

    Can someone please tell me what could be causing this problem.
     
    dragshot, Jul 7, 2009
    #1
  2. dragshot

    Darren Senior Member

    Joined:
    Jul 29, 2004
    Messages:
    2,361
    Likes Received:
    0
    Location:
    Adelaide, South Australia
    The only way to know is to look at the logs. There are a few things which will be needed:
    1. A C-Gate log, event level 9
    2. A Schedule Plus log, for the same period as the C-Gate log
    3. Details of the failure

    See C:\Clipsal\PICED\Manuals\Advanced Fault Diagnosis.pdf for details.

    If the log files are really big, you can use the PICED log file filter to reduce the size.

    Send all of this to CIS Tech Support and ask them to forward it to me.
     
    Darren, Jul 9, 2009
    #2
Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments (here). After that, you can post your question and our members will help you out.