    Hi
    Can any one with the load manager. How can the duration time be reset.
    What i am looking to do is to get a report once per day, or a week to show my client the power usage on the system, and how the system is being managed. So from the manager i can see whats on and for how long. But how can i reset this so the client can see day by day.
    Thanks
     
    sjfp, Oct 23, 2008
    #1
  2. sjfp

    Darren Senior Member

    Joined:
    Jul 29, 2004
    Messages:
    2,361
    Likes Received:
    0
    Location:
    Adelaide, South Australia
    1. Open load monitor form
    2. Select all loads
    3. Click the Set Duration button
    4. Leave time at 0
    5. Click on OK
     
    Darren, Oct 26, 2008