Hey all, Something I cant work out how to do, but thought some genius might have a way, is to stop and start the scheduler from logic in Schedule Plus. The ability to do so, only seems to be available through the Schedule Manager or the Option Menu. Can anyone think of a decent way of doing that through logic? I guess one option, but very much not preferred would be to have an enable group on each schedule, but with over 100 schedules and schedules added and removed daily it would be troublesome. Thanks!