Syncronise Two Pcs Running Splus

Discussion in 'C-Touch/HomeGate/SchedulePlus/PICED Software' started by sjfp, Mar 25, 2011.

  1. sjfp

    sjfp

    Joined:
    Oct 31, 2004
    Messages:
    145
    Likes Received:
    1
    Location:
    UK
    We have project where we have a requirement to have a primary and secondary (for Redundancy) PC's running Schedule Plus. My question is how can we make sure these to PC are kept in sync with each other??
    I am thinking of how to control the usage of time clocks and system/user IO's and logic processes that may be used on the system.
    The reason is that if one PC goes bang, the other PC picks up the processes seamlessly
     
    sjfp, Mar 25, 2011
    #1
  2. sjfp

    Darren Senior Member

    Joined:
    Jul 29, 2004
    Messages:
    2,361
    Likes Received:
    0
    Location:
    Adelaide, South Australia
    At the moment, there is no in-built way of automatically synchronising all data between two copies of Schedule Plus. All C-Bus data (lighting levels, HVAC data etc) will be synchronised, but not in-built system IO variables.

    You can use logic to map a system IO variable to a lighting group and use that to synchronise the two S+ via C-Bus, but it is a little messy. I think there have been previous forum posts about this.
     
    Darren, Mar 25, 2011
    #2
Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments (here). After that, you can post your question and our members will help you out.