Time Scheduling in wiser home control

Discussion in 'C-Bus Serial Protocols' started by Zameer Amber, Dec 15, 2011.

  1. Zameer Amber

    Zameer Amber

    Joined:
    May 22, 2011
    Messages:
    3
    Likes Received:
    0
    Location:
    India
    Hello

    Can we do time shedulling through Wiser home Control?If Yes How?Please send me programme process.

    I have tried with time sheduling,it works with PC/Laptop connected to C-Bus network but when we disconnect PC/Laptop from C-Bus/wiser network we unable to get time scheduling.

    please suggest.
     
    Zameer Amber, Dec 15, 2011
    #1
  2. Zameer Amber

    kjayakumar

    Joined:
    Oct 27, 2008
    Messages:
    448
    Likes Received:
    0
    Zameer,

    Yes, you can have scheduling through Wiser. I did not understand what you meant in the last sentence. Keep in mind that scheduling takes a few minutes after a project transfer to start. Typical debug steps are to check that you have C-Bus connectivity, checking on whether the wiser has internet access (used for NTP time) and checking that the schedule is enabled properly. PICED has very useful help manuals about all of this. Have you read through these?
     
    kjayakumar, Dec 16, 2011
    #2
  3. Zameer Amber

    Zameer Amber

    Joined:
    May 22, 2011
    Messages:
    3
    Likes Received:
    0
    Location:
    India
    Thanks Jay,

    Last Scentence means that :-When we do scheduling in wiser and transfer the project it works ok when our laptop is connected to the network/wiser,However when we disconnect our laptop the scheduling which we have set doesn't happen.

    regards
     
    Zameer Amber, Dec 16, 2011
    #3
  4. Zameer Amber

    Darren Senior Member

    Joined:
    Jul 29, 2004
    Messages:
    2,361
    Likes Received:
    0
    Location:
    Adelaide, South Australia
    Do this simple test to confirm that schedules work in Wiser:
    1. Create a very simple Wiser project in PICED with a single Widget controlling a light
    2. Add a schedule:
    - repeat every 1 minute
    - pulse light on for 10 seconds, then off
    - no enable group
    3. Connect PICED to C-Bus and verify that the Schedule is operating
    4. Transfer the project to Wiser
    5. Wait for a few minutes for the Wiser scheduler to start
    6. If the schedule is not doing anything, open the Wiser user interface from a web browser and see if the widget can control the light
     
    Darren, Dec 16, 2011
    #4
Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments (here). After that, you can post your question and our members will help you out.